Semtrio
ACADEMY
Partner Login
Contact

By subscribing you agree to receive marketing communications from Semtrio. You can unsubscribe at any time.

Be the first to know what’s changing.

Semtrio
Follow us on

Services

Compliance and RegulatoryClimate AccountingSustainability ReportingClimate and Sustainability StrategySupply Chain Sustainability
ESG RatingsSustainable FinanceCapacity Building and TrainingCarbon Markets and Climate Projects

Industries

ManufacturingEnergyAviationFinance and Banking
TelecomsRetail and ConsumerConstruction MaterialsGroup Companies and Holdings

Works

All Clients & ProjectsKey ProjectsAccreditations

Insights

Case StudiesBlogsGlossaryResources

About

Who We AreWhy SemtrioWork With Us

Contact

Contact Us

Our Partners

B Corp Certified
CDP
UN Global Compact
Ecovadis CoreEcovadis Platinum
GRI Community Member

Copyright © 2026 All Rights Reserved.

Legal
Policies
Peerless Ventures

Designed by

Fameus
Home
Insights
Blog
Cradle-to-gate vs cradle-to-grave: choosing the LCA boundary for EPDs

Blog

Cradle-to-gate vs cradle-to-grave: choosing the LCA boundary for EPDs

life cycle assessmentLCAcradle to gatecradle to gravesystem boundaryEPDEN 15804ISO 14067

Publish: 23 Nov 26Reading Time: 7 Min

Cradle-to-gate means a life cycle assessment covers a product from raw material extraction to the moment it leaves the factory gate; cradle-to-grave continues through transport, installation, use and end of life. In EN 15804 terms, cradle-to-gate is modules A1–A3 and cradle-to-grave is A1 to C4. For a construction product EPD under EN 15804+A2, the minimum is A1–A3 plus C1–C4 and D, and a gate-only EPD is allowed only when three conditions are all met.

What do cradle-to-gate and cradle-to-grave mean?

Both terms describe the system boundary of a life cycle assessment (LCA): which processes are counted. ISO 14040 defines the life cycle as the consecutive, interlinked stages of a product system, from raw material acquisition or generation from natural resources to final disposal. A study that follows that full path is cradle-to-grave. A study that stops when the product leaves the manufacturer is cradle-to-gate.

  • Cradle-to-gate: raw material supply, transport to the plant and manufacturing. It answers "what did it take to make this product?"
  • Cradle-to-grave: everything above, plus distribution, installation, the use phase, and demolition, waste processing and disposal. It answers "what does this product cause over its whole life?"
  • Cradle-to-gate with options: a cradle-to-gate study that adds selected later stages; under EN 15804+A2 it includes end of life (C1–C4) and module D unless the product qualifies for the exemption below. ECO Platform lists it as one of three EPD types.

The boundary is set in the goal and scope of the study; ISO 14040 defines it as the set of criteria specifying which unit processes are part of a product system. The choice matters because the two results answer different questions and cannot be compared with each other.

Which life cycle modules does each boundary include?

EN 15804, the European standard for construction product EPDs, splits the life cycle into lettered modules. Construction product EPDs report their results in this structure.

Comparison of cradle-to-gate and cradle-to-grave: modules A1 to A3 ending at the factory gate versus modules A1 to C4 ending at disposal, with the EN 15804+A2 rule for each.
Stage Modules Cradle-to-gate Cradle-to-grave
Product stage A1 raw material supply · A2 transport to the manufacturer · A3 manufacturing ✓ ✓
Construction stage A4 transport to site · A5 installation — ✓
Use stage B1 use · B2 maintenance · B3 repair · B4 replacement · B5 refurbishment · B6 operational energy · B7 operational water — ✓
End-of-life stage C1 deconstruction and demolition · C2 transport to waste processing · C3 waste processing · C4 disposal — ✓
Beyond the system boundary D benefits and loads from reuse, recovery and recycling — Reported separately

Module D sits outside the product's life cycle. EN 15804 calls it "benefits and loads beyond the system boundary", such as those from reuse, recycling or energy recovery after end of life, and it is reported next to the A–C results rather than added into them.

Which boundary does an EPD under EN 15804+A2 need?

Under EN 15804+A2, a construction product EPD declares A1–A3, C1–C4 and D as a minimum. The construction and use modules (A4–A5, B1–B7) are added where the product category rules (PCR) require them; ECO Platform's rules, for example, require B6 for final products that consume energy.

A cradle-to-gate EPD (A1–A3 only) is permitted under clause 5.2 of EN 15804+A2 only if the product meets all three conditions, as ECO Platform's calculation rules set them out:

  1. It is physically integrated with other products during installation, so it cannot be separated from them at end of life.
  2. It is no longer identifiable at end of life because of a physical or chemical transformation.
  3. It contains no biogenic carbon.

The test is about the product, not the producer's preference. On our reading, a façade panel, a window or a steel section that can be removed and identified at end of life would fail the first two conditions, so its EPD declares end of life even if the manufacturer never sees the product again.

The EPD itself is a Type III environmental declaration under ISO 14025, which bases each declaration on PCR for the product category. EN 15804 provides the core PCR for construction products, and complementary PCRs add rules for specific product groups. Our guide on how to get an EPD walks through the steps from PCR to publication.

Which boundary does a product carbon footprint need?

ISO 14067 covers the carbon footprint of a product (CFP): the greenhouse gas emissions and removals of a product system, in CO₂ equivalents, based on an LCA that uses climate change as its single impact category. A full CFP follows the life cycle. ISO 14067 also defines a partial CFP, based on selected stages or processes of the life cycle. A cradle-to-gate product footprint is a partial CFP.

A cradle-to-gate footprint is often the only one a supplier can calculate with its own data. A producer of steel coil, aluminium billet or glass does not control what its customer makes from the material, so its use and end-of-life stages depend on someone else's product. The customer then adds its own stages. Name the boundary in the result, for example "kg CO₂e per tonne, cradle-to-gate (A1–A3)", so the number is not read as a full life cycle figure. Where a PCR applies to your product, it sets the boundary for you.

How do you choose the right boundary?

Start from who will use the number and what they will do with it:

  1. Name the document you owe. An EPD for a construction product follows EN 15804+A2. A product carbon footprint follows ISO 14067. A CBAM embedded emissions figure follows the CBAM rules, which is a production boundary, not an LCA.
  2. Find the PCR. Check whether a PCR exists for your product category with the programme operator your customer accepts. It fixes the modules, the scenarios and the declared or functional unit.
  3. Test the gate-only exemption. For construction products, check the three conditions. If one fails, plan C1–C4 and D from the start, including the end-of-life scenario and its data source.
  4. Write the downstream scenarios with sources. For A4–A5, B and C modules, record the transport distance, installation losses, service life and end-of-life route you assumed, and where each assumption came from.
  5. State the boundary next to every result. Use the module codes in tables and the boundary name in summaries. Never place a cradle-to-gate and a cradle-to-grave figure side by side as if they measured the same thing.

Is a CBAM embedded emissions figure a cradle-to-gate LCA?

No. CBAM embedded emissions cover the production process at the installation and relevant precursor materials, under boundaries set by the CBAM rules; the UK CBAM, for example, mirrors UK ETS boundaries and includes precursor goods. The figure covers greenhouse gases only, follows CBAM's own monitoring and allocation rules, and is limited to the processes and precursors those rules list, while an A1–A3 result covers the whole upstream supply chain. The two numbers can share data, but one cannot stand in for the other. Our guide to calculating CBAM embedded emissions and system boundaries explains the CBAM side.

What we see in practice

The boundary question usually arrives as a customer request: a façade contractor asks for an EPD, a buyer asks for a product footprint, an EU importer asks for CBAM data. Producers who answer each one separately end up with three numbers for the same product and no explanation of why they differ. Producers who keep one LCA model and report from it per boundary can show where each figure starts and stops. Our case studies on life cycle assessment across Şişecam's glass packaging product lines and Assan Alüminyum's environmental product declaration show that work in two materials. Life cycle assessment, environmental product declaration and product carbon footprint services build the model and the outputs from it.

Frequently asked questions

What does cradle-to-grave mean?

Cradle-to-grave is an LCA boundary that covers a product's whole life: raw material extraction, manufacturing, distribution, installation, use, and end of life through to disposal. In EN 15804 terms it covers modules A1 to C4, with module D reported separately.

What is the difference between cradle-to-gate and cradle-to-grave?

Cradle-to-gate stops when the product leaves the factory (A1–A3). Cradle-to-grave adds transport to site, installation, use and end of life (A4–C4). The results answer different questions and should not be compared with each other.

Can an EPD under EN 15804+A2 be cradle-to-gate only?

Only if the product meets all three conditions in clause 5.2: it is physically integrated with other products so it can't be separated at end of life, it is no longer identifiable at end of life after a physical or chemical transformation, and it contains no biogenic carbon. Otherwise the EPD declares A1–A3, C1–C4 and D as a minimum.

What is module D in an EPD?

Module D reports the net benefits and loads beyond the system boundary from reuse, recycling or energy recovery after end of life. It is shown next to the life cycle results, not added into them.

Is cradle-to-gate enough for a product carbon footprint?

It can be. ISO 14067 allows a partial CFP based on selected stages, which covers cradle-to-gate, as long as the boundary is stated. Check whether a PCR for your product or your customer's request sets a wider boundary.

Book a scoping call and leave with the boundary your EPD or product footprint needs, the PCR that applies, and the list of downstream data you will have to collect: Environmental product declaration.

Sources

  • ISO 14040:2006 Environmental management – Life cycle assessment – Principles and framework (confirmed 2022) – https://www.iso.org/standard/37456.html (checked 2026-11-23)
  • ISO 14040:2006/Amd 1:2020, sample text with amended definitions – https://cdn.standards.iteh.ai/samples/76121/262b977639614967b6084a9534967efd/ISO-14040-2006-Amd-1-2020.pdf (checked 2026-11-23)
  • European Commission Knowledge4Policy, glossary: system boundary (citing ISO 14040:2006) – https://knowledge4policy.ec.europa.eu/glossary-item/system-boundary_en (checked 2026-11-23)
  • ISO 14067:2018 Greenhouse gases – Carbon footprint of products, sample text, clauses 3.1.1.1–3.1.1.2 and Introduction – https://cdn.standards.iteh.ai/samples/71206/1e65cdf8fdd5408f991482591ffd9550/ISO-14067-2018.pdf (checked 2026-11-23)
  • ECO Platform, LCA Calculation Rules and Specifications for EPDs, V1.1 (June 2024), §3.2 and §3.3.3 – https://www.eco-platform.org/files/download/Documents/2024/ECO%20Platform%20Standards%20-%20LCA%20Calc.%20Rules_V1.1_clean.pdf (checked 2026-11-23)
  • EN 15804:2012+A2:2019 Sustainability of construction works – Environmental product declarations – Core rules for the product category of construction products, official preview (STN EN 15804+A2:2020): Scope, clause 5.2 title, clause 6.2 module list incl. 6.2.7 "D, Benefits and loads beyond the system boundary" – https://normy.normoff.gov.sk/norma/130702/nahlad (checked 2026-11-23)
  • HMRC, Carbon Border Adjustment Mechanism (CBAM): Policy summary (updated 2 November 2026) – https://www.gov.uk/government/publications/carbon-border-adjustment-mechanism-cbam-policy-summary/carbon-border-adjustment-mechanism-cbam-policy-summary (checked 2026-11-23)

Get in touch

Let's talk about what you're working on.

If something you've read here connects to a live project, a reporting deadline, or a decision you're weighing — we're happy to have a useful conversation.

Contact us

Related reading

UK CBAM from 1 January 2027: £50,000 registration threshold, five sectors, first return due 31 May 2028

Regulation & Compliance

7 Min23 Nov 26

UK CBAM from 1 January 2027: what exporters to the UK need to prepare

Read
Transition risk under IFRS S2 in four steps: map, classify, size and stress-test

Regulation & Compliance

7 Min23 Nov 26

Transition risk under IFRS S2: how to identify, assess and disclose it

Read
CBAM for non-EU exporters: the EU declarant files the declaration, the exporter's installation supplies verified emissions data